National Library, Santiago, Chile

 

In this first phase, the work has been focused on the skylights that allow the passage of light to the main halls of the library, including the dome crowning the main facade and illuminating the Bicentennial Hall. The intervention was necessary to guarantee the water tightness of the building, which presented abundant leaks due to aging and degradation of the metal structures, together with deficiencies in the glazing sealants, subjected to constant thermal stresses. In the work on roofs, the specific weather conditions of the location have forced us to increase the security measures, both on the exterior and the interior, while maintaining the normal activity of the building. During the restoration work, we have rectified original structural defects and we have applied polyurethane anti-corrosion coatings, we have installed new wired solar coated glass (blocking infrared and ultraviolet) with silicone structural sealant.

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies