• Rehabilitación integral de edificios en Madrid en la calle Atocha 8 - 10
  • Rehabilitación Integral Atocha 8-10 02
  • Rehabilitación Integral Atocha 8-10 03
  • Rehabilitación Integral Atocha 8-10 04
  • Rehabilitación Integral Atocha 8-10 05
  • Rehabilitación Integral Atocha 8-10 06
  • Rehabilitación Integral Atocha 8-10 07
  • Rehabilitación Integral Atocha 8-10 08
  • Rehabilitación Integral Atocha 8-10 09
  • Rehabilitación Integral Atocha 8-10 10

Atocha 8-10, Madrid, Spain

In Madrid’s Calle de Atocha, we are carrying out the comprehensive rehabilitation works of these two buildings located next to the Church of Santa Cruz. This intervention includes the execution of specific demolitions in structural elements, equipment and carpentry, as well as flooring and cladding, with the complication of the fact that the slabs between the two buildings were not at the same level, so we opted for a debris removal system using conveyor belts that minimized the inconvenience, optimized execution times and achieved a lower impact on this busy street. Subsequently, structural reinforcement works were carried out by means of slab connectors and compression layers and the replacement of damaged structural elements, as well as the execution of all the interior coatings and finishes and the complete provision of all the installations, including the construction of two elevators.